Shopping cart

“Throughout our jolurney, both before and after establishing our company, we’ve formed numerous partnerships with like-minded our companies worldwide. We welcome any offers of partnership from individuals or companies that share our goals and values.

Cargo Projects

CARGO PROJECTS 

Project Cargo refers to specialized surveys that are related to heavy, oversized and abnormal cargoes. Our role is to supervise the loading and discharge stages as well as terminal operations handling and subsequently report to you any damages, remarks or findings.

Heavy industrial equipment

We monitored the unloading operations in many shipments of semi-automatic gantry cranes of APM Terminal in Tanger Med 2.

 Breakbulk cargo
  • Preloading surveys, cargo measurement, stowage control and damage survey relating to cargo in bulk
    • Fish in holds of a reefer ship,
    • Phosphate,
    • Wood bundles,
    • Steel plates.
 Airport Ground Infrastructure & Equipment

We supervised in many shipments the unloading operations of all six (06) Passenger Boarding Bridges, from vessel discharge at Tanger Med port  to truck loading  for delivery to the Rabat-Salé Airport Expansion Project site. 

 Renewable Energies Equipment
  • Solar Energy: Monitoring of unloading operations, onloading / offloading on inland transport and delivery on site for all items for Noor 1 and Noor 2 in Solar Power Plant in Ouarzazate. 
  • Wind Energy: Monitoring of unloading operations of all windmill components of many Wind Farms with different collaborators:
    • Khaladia Site (VESTAS),
    • Midelt Site (Siemens-Gamesa),
    • Boulanouar Site in Mauritania (Siemens-Gamesa).
IMG_20250802_204356_DRO

Airport Ground Infrastructure & Equipment

We supervised in many shipments the unloading of all six (06) Passenger Boarding Bridge, from vessel discharge at Tanger Med port to truck loading for delivery to the Rabat-Sale Airport Expansion Project site.

IMG_7399

Heavy Industrial Equipment

We monitored the unloading operations in many shipments of semi-automatic gantry cranes of APM Terminal in Tanger Med 2.

IMG_0120

Breakbulk Cargo

Preloading surveys, cargo measurement, stowage control and damage survey relating to cargo in bulk : - Fish in holds of a reefer ship, - Phosphate, - Wood bundles, - Steel plates.

SAM_7011 scaled

RENEWABLE ENERGIES EQUIPMENT

Solar and Wind Energies: Monitoring of unloading operations, onloading/offloading on inland transport, and on-site delivery for all items related to Noor 1 and Noor 2 at the Solar Power Plant in Ouarzazate, as well as monitoring the unloading of all wind turbine components for several wind farms in collaboration with major partners, including the Khaladia site (VESTAS), the Midelt site (Siemens-Gamesa), and the Boulanouar site in Mauritania (Siemens-Gamesa).

0
0